DISMAL (The Lowdown) – Part 1
So it’s a fact that in all film productions, no matter the size, something will go wrong. You can’t fight it….or avoid it. Something wrong will happen. It’s just how you deal with it that makes all the difference between a ship that makes it to port, or sinks in the middle of the ocean.
For DISMAL, my DP (Shawn Lewallen) and myself had about a week to prep for the shoot….with only 3 days at the actual locations to tech scout and finalize the shot list. The major roadblock during the 3 days in Blakely, GA was that the only cell phone carrier on that area was VERIZON — which both Shawn and I…and 80% if the crew for that matter didn’t have. That was a BIG PROBLEM. No one could get a hold of anyone — and when you need things done…..that’s bad. Really bad.
We somehow managed to make it through, but here’s a picture of Shawn and I during a location scout wondering what was going on….
It was an adventure that only got better once the cameras started rolling…..
TO BE CONTINUED

















Gary's Facebook
Gary's IMDB
Gary’s Twitter
Kitchen Table Films